Terms and Conditions.
● Power connection via a pre-existing isolator.
● Free use of the charge point mobile application.
● Installation costs are dependent on several aspects, should they not be compliant added costs may be required, these might be:
○ An isolator is not already present/in place.
○ If a 2 way board is required for property/charger protection.
○ Where there is insufficient space to allow installation of certain products in the immediate area.
○ Current installation not to standard and no earth bonding in place.